Skip to content
Industrial Steel Buildings

45–60 m Span

The widest pitched-roof step of the series; 60 m column-free clear span with ultra-high-strength special steel members.

Series
CFS-S5
Span
up to 60 m column-free clear span
45–60 m Span

Sixty metres is the widest span a pitched-roof CFS system reaches. Beyond it the form itself has to change — the barrel vault systems take over from there.

At this step the appearance of the structure changes too: instead of a heavy conventional portal, a deep and dense lattice network becomes legible. As the scale grows the sections do not thicken; the number of members and the truss depth increase. What carries the load is not the thickness of a single section but the geometry of the frame.

That is also why uses such as aircraft hangars, congress centres and exhibition buildings gather at this step: in all of them the interior volume has to be a single piece.

Key Advantages

  • Clear span up to 60 m
  • No columns needed across a wide interior volume
  • Ultra-strength special steel members
  • High-strength bolts and connection plates
  • Straightforward assembly
  • Adaptable to a wide range of large building types

Request a quote for your project

Share your size, location and schedule; our engineering team will prepare the right solution.

Get a Quote